Timeline: from bathtub removal to shower installation
A conversion moves through a predictable sequence even when the calendar changes. Knowing the order makes it easier to understand why the crew may pause after demolition or return after the walls are in.
- Protect the room and remove the tub. The crew opens the wet area and disposes of the old materials.
- Check the exposed opening. The crew checks floor and framing conditions, verifies plumbing, and reviews any needed repairs with you.
- Prepare the floor, walls, and plumbing. The installer completes the rough work and coordinates any required inspections.
- Install the shower system and fixtures. The crew fits the base, walls, and trim. Some glass gets measured once the walls are finished.
- Test, clean up, and walk through the project. Confirm when any sealant can get wet and when the shower is ready.
Ask Blink Bath which of these stages will require separate visits on your project.
For help applying these options to your bathroom, explore our walk-in shower installation in Ogden page.
Get a written quote for your bathroom
We'll measure in your home, walk through your options, and put the scope and price in writing.
Request a free quote