How long does a tub-to-shower conversion take?
Most Blink Bath shower conversions are installed within one to two days. Here's what happens at each stage and what can stretch the schedule.
How long it takes
The hands-on install in your home is typically completed within one to two days. Measuring, ordering your base, panels and fixtures, and custom glass lead times sit before and after that, and we put the dates in your written quote.
The stages
Every conversion follows the same basic order:
- Free in-home measure and design choices.
- Ordering the base, wall panels, fixtures, and glass.
- Removing the old tub and surround, then checking the walls and subfloor.
- Plumbing updates for the drain and valve.
- Installing the shower base and seamless wall panels.
- Fixtures, accessories, glass, and a final walkthrough.
Why panels are faster than tile
Tile needs waterproofing, setting, grouting, and curing time between steps. Seamless acrylic or stone-composite panels skip most of that, so the hands-on work in your home is much shorter.
What can add time
Hidden water damage, soft subfloor, moving the drain, or custom glass can each add time. We check for these during the measure and tell you before work starts.
The two dates that matter
The first date is when the crew starts; the second is when you can use the shower. The time between signing and installation depends on material availability and scheduling. The time your bathroom spends out of service depends on the work itself and the products' cure times.
If it's your only bathroom, ask three separate questions: How long will the water be off? Will the toilet still be available each evening? When can I take a shower? We'll walk through those dates with you when you review your project.
Common questions
Can I use my bathroom during the conversion?
The shower is out of service while we work. If it's your only shower, let us know so we can plan the schedule around that.
When will I get a schedule?
We give you a clear timeline with your written quote, after the in-home measure. The install itself is typically one to two days.