What happens during a shower installation
Knowing what happens on each day of your shower installation makes the project easier to plan around.
1. Free in-home estimate
We measure your space, talk through how you use the bathroom, show wall and base samples, and give you one clear price before any work starts.
2. Ordering your materials
Your base, wall panels, glass, and fixtures are ordered to fit your measurements, so install day goes smoothly.
3. Protecting your home and removing the old shower
We protect floors and the path to the bathroom, then remove the old tub or shower and haul it away.
4. Inspecting and preparing the space
We check the walls, subfloor, and plumbing behind the old unit and tell you about anything that needs attention before we continue.
5. Installing the base, walls, and fixtures
The new base goes in, seamless wall panels are fitted, and fixtures, grab bars, seats, and shelves are installed.
6. Glass, cleanup, and walkthrough
We hang the door or curtain, clean up, and walk you through care and your limited lifetime warranty on materials and labor.
What the written scope should cover
Look for demolition and haul-away, the planned drain and valve work, preparation of the opening, the shower base and wall system, the enclosure or curtain hardware, and the accessories you selected. Find out who will handle permits if required and who will fix the wall and floor where the new shower meets the old bathroom.
What happens to your plumbing
Before removing the tub, the installer identifies the shutoff and disconnects the tub fittings. Once the opening is exposed, the crew can see how the drain, trap, and supply lines are laid out, determines what can be reused, and prepares the connections for the new base and fixtures. The tub spout is typically removed in a shower-only setup, and the new valve and outlet may be moved to a better height. Ask how connections are checked before the wall system goes in, and ask about the expected shutoff window if you need to plan around laundry, work, or other routines.
When the crew needs you
The first decision point often comes after the tub is out: if the crew finds damage or a plumbing issue, they should explain what they found and send you the scope, price, and schedule impact before doing extra work. The second comes before accessories go in — check shelf, seat, and grab bar placement while there is still time to adjust. If your home was built before 1978, ask how painted surfaces will be handled before demolition.
Common questions
Do I need to be home during the installation?
Someone should be home at the start and for the final walkthrough. We'll confirm details when we schedule.
How long will my shower installation take?
Most Blink Bath shower installs are completed within one to two days. Seamless panel installs are usually much faster than tile. You get a schedule with your quote.
Want a real number for your bathroom?
With over 30 years of construction experience, we measure in your home and give one fixed price.